Filling valve for cistern
It works with a single operator and has the capacity to leak test 6 products at the same time.
The machine checks around 400 products per hour.
It detects pressure leaks up to 100 mbar.
Adjustable test station for two different types of filling valves.
It records the testing results and reports the number of products that passed or failed the test.
3D models are prepared for presentation purposes to show the customer the main lines and operating principles of the machine during the quotation phase.
The product samples we receive from the customer are checked for dimensions and structure, the tolerances of the customer's production are measured, the first prototypes are designed and the designs are tested.
The final design process begins based on the information from the prototype studies of the products to be tested/assembled.
The machining of the designed parts begins and at the same time the machine elements are delivered. The machined parts are measured and sorted according to the material for coating. After coating, the parts together with the delivered machine elements are ready for assembly. The entire manufacturing process is carried out using external resources.
After assembling the coated parts, the workstations have taken shape. Now it is time to install the electrical and air installations.
The machine, with air and electrical installations provided, is put into operation for testing and fine-tuning. During this process, the basic software scenario and mechanical operations are observed and tested, and software improvements are made. Small errors missed in the design or modeling phase are quickly corrected in our own workshop.