Main brass part
PTFE Washer
1st O-ring
2nd O-ring
The machine feeds all the required parts to the work stations via the vibration feed system. Each work station takes the required parts from its magazine one after the other.
Production is 900 pieces per hour
Assembly process
The main brass part is placed in the mounting area.
The PTFE washer is assembled on the main brass part with the automatic positioning mechanism.
Then the 1st O-ring and the 2nd O-ring are installed one after the other.
All assembly steps are carried out automatically, including positioning and checking.
The final design process begins based on the information from the prototype studies of the products to be tested/assembled.
The machining of the designed parts begins and at the same time the machine elements are delivered. The machined parts are measured and sorted according to the material for coating. After coating, the parts together with the delivered machine elements are ready for assembly. The entire manufacturing process is carried out using external resources.
After assembling the coated parts, the workstations have taken shape. Now it is time to install the electrical and air installations.
The machine, with air and electrical installations provided, is put into operation for testing and fine-tuning. During this process, the basic software scenario and mechanical operations are observed and tested, and software improvements are made. Small errors missed in the design or modeling phase are quickly corrected in our own workshop.